Materials calculator

Concrete Calculator

Estimate concrete volume for rectangular slabs and footings, with waste and bag counts.

Enter your measurements

Your estimate

1.63 yd³

Concrete including waste

Volume before waste
40 ft³ / 1.48 yd³
40 lb bags
147
60 lb bags
98
80 lb bags
74

Bag counts use typical yields shown below and are approximate.

What this calculator does

This tool turns your measurements into a consistent planning estimate you can review before pricing or starting work. It is useful during early takeoffs, option comparisons, and on-site checks where transparent math matters.

How the calculation works

FormulaVolume = length × width × depth × quantity. Planned volume = volume × (1 + waste%).

Worked example

A 10 × 12 ft slab, 4 in thick, is 40 ft³ or 1.48 yd³ before waste.

How to measure

  1. 01Measure the finished inside dimensions of the pour.
  2. 02Take several depth readings where the base is uneven.

Common mistakes to avoid

  • Entering inches as feet
  • Forgetting repeated footings
  • Ordering exactly the theoretical volume

Limits of this estimate

Bag yields are typical planning values—40 lb: 0.30 ft³, 60 lb: 0.45 ft³, 80 lb: 0.60 ft³. Product yield and site conditions vary.

Frequently asked questions

How much waste should I add?

Five to ten percent is a common planning range, but base accuracy and access can change it.

Does this cover irregular shapes?

Split the shape into rectangles and calculate each section.